middle.news
Frontier Energy Plans 1GW Solar Expansion to Replace WA Coal by 2031
8:33am on Tuesday 7th of October, 2025 AEDT
•
Energy
Read Story
Frontier Energy Plans 1GW Solar Expansion to Replace WA Coal by 2031
8:33am on Tuesday 7th of October, 2025 AEDT
Key Points
Targeting ~1GW solar and ~660MW battery storage by 2031
Expansion leverages existing grid connections, avoiding costly transmission upgrades
Stage One (120MW solar, 81.5MW battery) aims for October 2027 operation
Stage Two (~120MW solar, ~80MW battery) has development approval, revenue certainty targeted in 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Frontier Energy (ASX:FHE)
OPEN ARTICLE