middle.news
Winchester Energy Advances Texas Waterflood Project with JVU-5 Drilling Start
8:28am on Thursday 9th of October, 2025 AEDT
•
Energy
Read Story
Winchester Energy Advances Texas Waterflood Project with JVU-5 Drilling Start
8:28am on Thursday 9th of October, 2025 AEDT
Key Points
Drilling of JVU-5 production well started on 7 October 2025
Winchester holds 70% working interest and operates the Varn joint venture
JVU-5 well planned to reach 4,900 feet depth with a 5-day drilling schedule
Varn project includes 10 wells targeting proven and probable reserves of 1.07 million barrels of oil equivalent
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Winchester Energy (ASX:WEL)
OPEN ARTICLE