middle.news
Asian Battery Metals Validates Over 20m Massive Sulphide at Maikhan Uul
9:34am on Monday 13th of October, 2025 AEDT
•
Mining
Read Story
Asian Battery Metals Validates Over 20m Massive Sulphide at Maikhan Uul
9:34am on Monday 13th of October, 2025 AEDT
Key Points
Drillhole MU2501 intersects 20.35m of massive sulphide mineralisation
MU2501 twins historic drillhole MU_DH1204, confirming previous high-grade zones
Asian Battery Metals holds a 6-month option to acquire 100% of Maikhan Uul project
Assay results pending, expected within 3-5 weeks
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
ASIAN BATTERY METALS PLC (ASX:AZ9)
OPEN ARTICLE