middle.news

Asian Battery Metals Validates Over 20m Massive Sulphide at Maikhan Uul

9:34am on Monday 13th of October, 2025 AEDT Mining
Read Story

Asian Battery Metals Validates Over 20m Massive Sulphide at Maikhan Uul

9:34am on Monday 13th of October, 2025 AEDT
Key Points
  • Drillhole MU2501 intersects 20.35m of massive sulphide mineralisation
  • MU2501 twins historic drillhole MU_DH1204, confirming previous high-grade zones
  • Asian Battery Metals holds a 6-month option to acquire 100% of Maikhan Uul project
  • Assay results pending, expected within 3-5 weeks
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about ASIAN BATTERY METALS PLC (ASX:AZ9)
OPEN ARTICLE