middle.news

How Finder Energy’s TIMOR GAP Deal Fast-Tracks KTJ Oil Project to First Oil

8:33am on Monday 13th of October, 2025 AEDT Energy
Read Story

How Finder Energy’s TIMOR GAP Deal Fast-Tracks KTJ Oil Project to First Oil

8:33am on Monday 13th of October, 2025 AEDT
Key Points
  • 50% of KTJ Project development capex secured via TIMOR GAP farmin
  • Independent RISC Advisory verification increases KTJ contingent resources
  • Strategic alliance with SLB accelerates project engineering and design
  • Final Investment Decision targeted by mid-2026, first oil by end-2027
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Finder Energy Holdings (ASX:FDR)
OPEN ARTICLE