middle.news
How Will 29Metals Overcome Seismic Setbacks at Golden Grove?
8:43am on Wednesday 15th of October, 2025 AEDT
•
Mining
Read Story
How Will 29Metals Overcome Seismic Setbacks at Golden Grove?
8:43am on Wednesday 15th of October, 2025 AEDT
Key Points
Copper production steady at 5.8kt despite operational challenges
Zinc output sharply down to 2.0kt due to seismic activity restricting access
C1 costs surged to US$3.74/lb copper sold amid major shutdown and stockpile movements
Gossan Valley project remains on track for first ore by end 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
29Metals (ASX:29M)
OPEN ARTICLE