middle.news
Can Metgasco Unlock Toolachee Gas Potential in Phase 2 Uplift?
10:01am on Friday 17th of October, 2025 AEDT
•
Energy
Read Story
Can Metgasco Unlock Toolachee Gas Potential in Phase 2 Uplift?
10:01am on Friday 17th of October, 2025 AEDT
Key Points
Vali-2 well produces variable gas flow with associated water
Vali-1 stable from Patchawarra but Toolachee formation flow remains negligible
Vali-3 nitrogen lift operations planned for November
Total raw gas production at 2.4 million standard cubic feet per day
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Metgasco (ASX:MEL)
OPEN ARTICLE