middle.news

Can Metgasco Unlock Toolachee Gas Potential in Phase 2 Uplift?

10:01am on Friday 17th of October, 2025 AEDT Energy
Read Story

Can Metgasco Unlock Toolachee Gas Potential in Phase 2 Uplift?

10:01am on Friday 17th of October, 2025 AEDT
Key Points
  • Vali-2 well produces variable gas flow with associated water
  • Vali-1 stable from Patchawarra but Toolachee formation flow remains negligible
  • Vali-3 nitrogen lift operations planned for November
  • Total raw gas production at 2.4 million standard cubic feet per day
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Metgasco (ASX:MEL)
OPEN ARTICLE