middle.news
Evergreen Lithium Fast-Tracks Drilling at Mt Monger Gold Project
8:50am on Wednesday 22nd of October, 2025 AEDT
•
Mining
Read Story
Evergreen Lithium Fast-Tracks Drilling at Mt Monger Gold Project
8:50am on Wednesday 22nd of October, 2025 AEDT
Key Points
Program of Work approvals obtained from WA mining regulator
Drilling to target Duchess of York and Kiaki Soaks prospects
1,800m RC drilling campaign planned with contractor engaged
Project benefits from strong local infrastructure and proximity to operating mill
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
EG1
OPEN ARTICLE