middle.news
Verity Resources Confirms High-Grade Gold Continuity at Monument Project
9:18am on Thursday 23rd of October, 2025 AEDT
•
Mining
Read Story
Verity Resources Confirms High-Grade Gold Continuity at Monument Project
9:18am on Thursday 23rd of October, 2025 AEDT
Key Points
Phase 1 drilling confirms consistent +1g/t gold intercepts at Korong deposit
Exceptional high-grade intercepts include 7.7m @ 6.37g/t Au with 1m @ 38.0g/t
Program aims to upgrade 154koz inferred resource to indicated status
Phase 2 RC and diamond drilling in progress targeting resource expansion
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
VRL
OPEN ARTICLE