middle.news

Verity Resources Confirms High-Grade Gold Continuity at Monument Project

9:18am on Thursday 23rd of October, 2025 AEDT Mining
Read Story

Verity Resources Confirms High-Grade Gold Continuity at Monument Project

9:18am on Thursday 23rd of October, 2025 AEDT
Key Points
  • Phase 1 drilling confirms consistent +1g/t gold intercepts at Korong deposit
  • Exceptional high-grade intercepts include 7.7m @ 6.37g/t Au with 1m @ 38.0g/t
  • Program aims to upgrade 154koz inferred resource to indicated status
  • Phase 2 RC and diamond drilling in progress targeting resource expansion
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about VRL
OPEN ARTICLE