middle.news

Galileo Mining Unveils Extensive PGE Mineralisation at Norseman, Poised for Next Drilling Phase

8:43am on Monday 27th of October, 2025 AEDT Mining
Read Story

Galileo Mining Unveils Extensive PGE Mineralisation at Norseman, Poised for Next Drilling Phase

8:43am on Monday 27th of October, 2025 AEDT
Key Points
  • 4,300m aircore drilling reveals continuous PGE anomalism at Mission Sill prospect
  • High-grade intersections include 4.78 g/t combined palladium-platinum-gold over 4m
  • Follow-up reverse circulation (RC) drilling planned to test bedrock mineralisation
  • Strong cash position of approximately $8.75 million to fund ongoing exploration
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Galileo Mining (ASX:GAL)
OPEN ARTICLE