middle.news
Galileo Mining Unveils Extensive PGE Mineralisation at Norseman, Poised for Next Drilling Phase
8:43am on Monday 27th of October, 2025 AEDT
•
Mining
Read Story
Galileo Mining Unveils Extensive PGE Mineralisation at Norseman, Poised for Next Drilling Phase
8:43am on Monday 27th of October, 2025 AEDT
Key Points
4,300m aircore drilling reveals continuous PGE anomalism at Mission Sill prospect
High-grade intersections include 4.78 g/t combined palladium-platinum-gold over 4m
Follow-up reverse circulation (RC) drilling planned to test bedrock mineralisation
Strong cash position of approximately $8.75 million to fund ongoing exploration
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Galileo Mining (ASX:GAL)
OPEN ARTICLE