middle.news
How Is Melbana Energy Navigating Drilling Delays and Permit Changes?
12:51pm on Monday 27th of October, 2025 AEDT
•
Energy
Read Story
How Is Melbana Energy Navigating Drilling Delays and Permit Changes?
12:51pm on Monday 27th of October, 2025 AEDT
Key Points
Continuous oil production at Cuba’s Block 9 with over 33,000 barrels in inventory
Amistad-2 well spudded despite logistical delays from hurricanes and power outages
Preparations progressing for contingent Amistad-3 drilling in Cuba
Australian permits WA-544-P and NT/P87 receive work program variations, removing seismic survey requirements
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Melbana Energy (ASX:MAY)
OPEN ARTICLE