middle.news

How Is Melbana Energy Navigating Drilling Delays and Permit Changes?

12:51pm on Monday 27th of October, 2025 AEDT Energy
Read Story

How Is Melbana Energy Navigating Drilling Delays and Permit Changes?

12:51pm on Monday 27th of October, 2025 AEDT
Key Points
  • Continuous oil production at Cuba’s Block 9 with over 33,000 barrels in inventory
  • Amistad-2 well spudded despite logistical delays from hurricanes and power outages
  • Preparations progressing for contingent Amistad-3 drilling in Cuba
  • Australian permits WA-544-P and NT/P87 receive work program variations, removing seismic survey requirements
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Melbana Energy (ASX:MAY)
OPEN ARTICLE