middle.news

Elixir Energy Advances Queensland Gas Play with Diona-1 Testing and Lorelle-3 Drilling

10:21am on Wednesday 29th of October, 2025 AEDT Energy
Read Story

Elixir Energy Advances Queensland Gas Play with Diona-1 Testing and Lorelle-3 Drilling

10:21am on Wednesday 29th of October, 2025 AEDT
Key Points
  • Elixir resumes operatorship and testing at Diona-1 with JV formalised
  • Multi-stage stimulation and production testing planned for this quarter
  • Lorelle-3 appraisal well drilling secured for January 2026 using Shell-approved H&P FlexRig 648
  • Lorelle-3 aims to validate high-quality acreage and Basin Centred Gas Play potential
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elixir Energy (ASX:EXR)
OPEN ARTICLE