middle.news
Elixir Energy Advances Queensland Gas Play with Diona-1 Testing and Lorelle-3 Drilling
10:21am on Wednesday 29th of October, 2025 AEDT
•
Energy
Read Story
Elixir Energy Advances Queensland Gas Play with Diona-1 Testing and Lorelle-3 Drilling
10:21am on Wednesday 29th of October, 2025 AEDT
Key Points
Elixir resumes operatorship and testing at Diona-1 with JV formalised
Multi-stage stimulation and production testing planned for this quarter
Lorelle-3 appraisal well drilling secured for January 2026 using Shell-approved H&P FlexRig 648
Lorelle-3 aims to validate high-quality acreage and Basin Centred Gas Play potential
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Elixir Energy (ASX:EXR)
OPEN ARTICLE