middle.news

Greenvale Energy Uncovers High-Grade Uranium Extensions at Oasis Project

10:12am on Wednesday 29th of October, 2025 AEDT Mining
Read Story

Greenvale Energy Uncovers High-Grade Uranium Extensions at Oasis Project

10:12am on Wednesday 29th of October, 2025 AEDT
Key Points
  • Five of six recent drill holes show high-grade uranium intercepts exceeding 1,000ppm eU3O8
  • Spectral gamma results align with structural data from ground magnetics surveys
  • Potential discovery of a second north-south high-grade shear zone adjacent to main deposit
  • Diamond core assays pending, expected in Q4 2025
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about GRV
OPEN ARTICLE