middle.news

How Did Ioneer Slash Leach Time to Boost Lithium Output by 9% at Rhyolite Ridge?

10:12am on Wednesday 29th of October, 2025 AEDT Mining
Read Story

How Did Ioneer Slash Leach Time to Boost Lithium Output by 9% at Rhyolite Ridge?

10:12am on Wednesday 29th of October, 2025 AEDT
Key Points
  • Leach retention time reduced from 3 to 1.5 days
  • 19% increase in unlevered NPV to US$2.237 billion
  • Lithium hydroxide production up 9% to 27,800 tpa
  • Operating costs remain stable with US$4,628/t LCE AISC net of boric acid credits
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about INR
OPEN ARTICLE