middle.news
How Celsius’ Latest Drilling and Bridge Loan Propel MCB Project Forward
9:29am on Friday 31st of October, 2025 AEDT
•
Mining
Read Story
How Celsius’ Latest Drilling and Bridge Loan Propel MCB Project Forward
9:29am on Friday 31st of October, 2025 AEDT
Key Points
Feasibility Study update and Front-End Engineering Design on track for December completion
Positive metallurgical drilling results confirm high-grade copper-gold mineralisation
Second drawdown of US$10 million bridge loan from Maharlika Investment Corporation
Community skills training and scholarships bolster local development
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
CLA
OPEN ARTICLE