middle.news

How Elementos Boosted Tungsten Grades 6.8x at Cleveland Project

9:27am on Thursday 6th of November, 2025 AEDT Mining
Read Story

How Elementos Boosted Tungsten Grades 6.8x at Cleveland Project

9:27am on Thursday 6th of November, 2025 AEDT
Key Points
  • Tungsten grade uplift of 4.1x for main sample and 6.8x for low-grade sample
  • Tungsten recoveries of 87% and 69% respectively with substantial mass rejection
  • XRT ore sorting could reduce processing plant size and costs
  • Re-evaluation of Cleveland’s tungsten Mineral Resource Estimate underway
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elementos (ASX:ELT)
OPEN ARTICLE