middle.news

Haranga Resources Mobilises Rig for Second Phase Drilling at Ibel South

8:32am on Friday 7th of November, 2025 AEDT Mining
Read Story

Haranga Resources Mobilises Rig for Second Phase Drilling at Ibel South

8:32am on Friday 7th of November, 2025 AEDT
Key Points
  • Second phase 3,000m Aircore drilling underway at Ibel South Gold Project
  • Maiden drilling returned multiple broad, high-grade near-surface gold intercepts
  • Drilling program expected to take around 20 days with potential extension to 4,000m
  • Project located in prolific Birimian gold province near major producing mines
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Haranga Resources (ASX:HAR)
OPEN ARTICLE