middle.news

FMR Uncovers Copper Veins and Potassic Alteration Above Porphyry Target at Llahuin

8:34am on Monday 10th of November, 2025 AEDT Mining
Read Story

FMR Uncovers Copper Veins and Potassic Alteration Above Porphyry Target at Llahuin

8:34am on Monday 10th of November, 2025 AEDT
Key Points
  • Drilling at Target A reached 1,198.9m with copper-bearing veins observed
  • Strong potassic–biotite alteration detected above main magnetotelluric target
  • Temporary drilling pause due to mechanical failure; replacement gear mobilised
  • Geophysical data confirms drillhole remains above primary porphyry centre
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about FMR
OPEN ARTICLE