middle.news

NexGen Unveils High-Grade Uranium Breakthrough at Patterson Corridor East

8:29am on Thursday 13th of November, 2025 AEDT Mining
Read Story

NexGen Unveils High-Grade Uranium Breakthrough at Patterson Corridor East

8:29am on Thursday 13th of November, 2025 AEDT
Key Points
  • Drillhole RK-25-254 yields 10.5m at 11.3% U3O8 with peak grades up to 56.2%
  • Strong mineralization continuity confirmed over 330m vertical extent
  • High-grade subdomains expanding with new assay results
  • PCE discovery located 3.5km east of NexGen’s Arrow deposit
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about NXG
OPEN ARTICLE