middle.news
Winchester Energy Launches Production at Varn JVU-5 Well with Promising Start
3:21pm on Friday 14th of November, 2025 AEDT
•
Energy
Read Story
Winchester Energy Launches Production at Varn JVU-5 Well with Promising Start
3:21pm on Friday 14th of November, 2025 AEDT
Key Points
JVU-5 well begins production at Varn Oil Field, Texas
Initial oil rate averages 25 barrels per day over first week
Water production recorded at 74 barrels per day initially
JVU-5 is second producer in planned 10-well waterflood project
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Winchester Energy (ASX:WEL)
OPEN ARTICLE