middle.news

Winchester Energy Launches Production at Varn JVU-5 Well with Promising Start

3:21pm on Friday 14th of November, 2025 AEDT Energy
Read Story

Winchester Energy Launches Production at Varn JVU-5 Well with Promising Start

3:21pm on Friday 14th of November, 2025 AEDT
Key Points
  • JVU-5 well begins production at Varn Oil Field, Texas
  • Initial oil rate averages 25 barrels per day over first week
  • Water production recorded at 74 barrels per day initially
  • JVU-5 is second producer in planned 10-well waterflood project
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Winchester Energy (ASX:WEL)
OPEN ARTICLE