Fulcrum Faces Key Phase 3 Drilling Tests After Major Lithium Target Expansion
Fulcrum Lithium has unveiled promising geophysical survey results that significantly extend the known lithium claystone mineralisation at its Alkali Flats project in Nevada, setting the stage for an ambitious Phase 3 drilling campaign.
- 25km Controlled-Source Audio-Frequency Magnetotelluric (CSAMT) survey completed
- Lithium claystone target area expanded from 9km to 42km aerial extent
- High confidence mapping supports Phase 3 drilling planning and permitting
- Phase 3 drilling to include core holes for metallurgical studies and infill drilling
- Project located near established lithium operations in a mining-friendly jurisdiction
Geophysical Breakthrough at Alkali Flats
Fulcrum Lithium Ltd (ASX, FUL) has reported compelling results from a 25-kilometre Controlled-Source Audio-Frequency Magnetotelluric (CSAMT) survey conducted at its 100% owned Alkali Flats lithium claystone project in Esmeralda County, Nevada. This high-resolution geophysical technique has delivered a robust dataset that significantly expands the known lithium mineralisation footprint beyond previous drilling results.
The survey’s interpretation reveals a 42-square-kilometre aerial extent of thick, shallow lithium-bearing claystones, a substantial increase from the 9-square-kilometre area delineated by the Phase 2 drilling campaign. This expansion not only underscores the potential scale of the deposit but also enhances geological confidence in the continuity and thickness of the lithium horizons.
Strategic Implications for Upcoming Drilling
According to Scott Keenan, Fulcrum’s Chief Operating Officer, the CSAMT data has been instrumental in refining the geological model and guiding the design of the forthcoming Phase 3 drilling program. The survey identified key structural features such as extensional faults and upthrown blocks that bring mineralised claystones closer to the surface, in some cases less than 25 metres deep, which could have positive implications for future extraction methods.
The Phase 3 program is poised to build on these insights with core drilling aimed at detailed metallurgical studies, infill drilling to tighten the resource model, and testing of the newly mapped extensions. These efforts are critical steps toward delivering a maiden JORC-compliant resource estimate, a milestone that will provide the market with a clearer valuation of the project’s economic potential.
Context Within Nevada’s Lithium Landscape
Alkali Flats is strategically located near established lithium operations, including Albemarle Corporation’s Silver Peak mine, the only producing lithium mine in the United States, and other advanced exploration projects in the Tonopah region. The project’s geological setting within a closed basin with high geothermal activity aligns with recognized models for lithium claystone deposits, enhancing its prospectivity.
Fulcrum’s methodical approach, combining geophysical surveys with phased drilling and metallurgical testing, reflects a disciplined strategy to de-risk the project and unlock value in a jurisdiction known for its mining-friendly policies.
Looking Ahead
While the CSAMT survey results mark a significant advancement, the ultimate commercial viability of Alkali Flats hinges on forthcoming Phase 3 drilling outcomes and metallurgical test results. Investors will be watching closely as Fulcrum progresses toward its maiden resource estimate, which could position the company as a notable player in the burgeoning US lithium sector.
Bottom Line?
Fulcrum’s expanded lithium target at Alkali Flats sets a promising stage, but upcoming drilling and metallurgical results will be the true test of its potential.
Questions in the middle?
- What lithium grades and recoveries will Phase 3 metallurgical studies reveal?
- How will the expanded target area impact the scale and economics of the eventual resource?
- What timeline can investors expect for the maiden JORC resource estimate release?