middle.news
Lightning Minerals Unveils 12km Gold System at Mt Turner Project
9:11am on Monday 17th of November, 2025 AEDT
•
Mining
Read Story
Lightning Minerals Unveils 12km Gold System at Mt Turner Project
9:11am on Monday 17th of November, 2025 AEDT
Key Points
Gold mineralisation intersected in 8 of 9 drill holes
Large-scale mineralised system extends 12km along Drummer Fault
High-grade gold assays up to 21.9g/t Au from soil and rock-chip sampling
Significant wide gold zones at Pit 6 (Rocky Reward)
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Lightning Minerals (ASX:L1M)
OPEN ARTICLE