middle.news
FireFly Metals Expands Green Bay Resource, Eyes Mid-Tier Copper-Gold Production
9:34am on Tuesday 18th of November, 2025 AEDT
•
Mining
Read Story
FireFly Metals Expands Green Bay Resource, Eyes Mid-Tier Copper-Gold Production
9:34am on Tuesday 18th of November, 2025 AEDT
Key Points
Green Bay resource upgraded to 50.4Mt measured and indicated, plus 29.3Mt inferred
High-grade core zone remains open with ongoing drilling by six underground rigs
Project benefits from existing mine infrastructure, deep-water port access, and low-cost hydro power
Environmental permits secured; economic studies planned for early 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
FFM
OPEN ARTICLE