middle.news
McLaren Minerals Unveils Massive 85% Resource Boost at McLaren Project
9:42am on Tuesday 18th of November, 2025 AEDT
•
Mining
Read Story
McLaren Minerals Unveils Massive 85% Resource Boost at McLaren Project
9:42am on Tuesday 18th of November, 2025 AEDT
Key Points
Total Mineral Resource increased to 529 million tonnes at 4.5% heavy minerals
Indicated Resource more than tripled from 79Mt to 249Mt
Contained ilmenite rose to around 7 million tonnes, strengthening global standing
Updated resource supports ongoing Pre-Feasibility Study and flexible mine design
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
McLaren Minerals (ASX:MML)
OPEN ARTICLE