middle.news

Red Sky Energy’s Yarrow 1 Well Surpasses Production Targets Ahead of Schedule

9:17am on Tuesday 18th of November, 2025 AEDT Energy
Read Story

Red Sky Energy’s Yarrow 1 Well Surpasses Production Targets Ahead of Schedule

9:17am on Tuesday 18th of November, 2025 AEDT
Key Points
  • Yarrow 1 well tied in and producing ahead of schedule
  • Initial production rate of ~2.4 MMscf/d exceeds forecast of 1.6 MMscf/d
  • Hydraulic fracture stimulation delivered strong gas flowback of ~1.8 MMscf/d
  • Red Sky holds 20% interest; Santos operates with 80% stake
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Red Sky Energy (ASX:ROG)
OPEN ARTICLE