middle.news
True North Copper Unveils 7.9% Copper Hit, Extends Aquila Strike Over 700m
8:36am on Tuesday 18th of November, 2025 AEDT
•
Mining
Read Story
True North Copper Unveils 7.9% Copper Hit, Extends Aquila Strike Over 700m
8:36am on Tuesday 18th of November, 2025 AEDT
Key Points
7m at 7.9% copper intercept at Aquila Prospect
Strike length extended to more than 700 meters and remains open
Phase 2 drilling completed with 26 holes for 7,074 meters
High-grade shoots confirmed within continuous Cu-Co-Ag mineralisation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
TNC
OPEN ARTICLE