middle.news

Marmota Launches Major Stage 2 Drilling at Greenewood After Bonanza Gold Hits

8:51am on Thursday 20th of November, 2025 AEDT Mining
Read Story

Marmota Launches Major Stage 2 Drilling at Greenewood After Bonanza Gold Hits

8:51am on Thursday 20th of November, 2025 AEDT
Key Points
  • Stage 2 drilling underway with ~85 holes planned totaling ~8,500m
  • Stage 1 delivered bonanza-grade gold intersections near surface
  • Greenewood located near Marmota’s flagship Aurora Tank deposit
  • Drilling targets include resource extension and infill for estimation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about MEU
OPEN ARTICLE