middle.news
Elixir Energy Mobilizes Shell-Backed Rig for High-Stakes Lorelle-3 Well
8:33am on Friday 21st of November, 2025 AEDT
•
Energy
Read Story
Elixir Energy Mobilizes Shell-Backed Rig for High-Stakes Lorelle-3 Well
8:33am on Friday 21st of November, 2025 AEDT
Key Points
Contract signed with Helmerich & Payne for FlexRig3 MM 648
Rig mobilization scheduled for January 12, 2026
Site preparation 30% complete at Lorelle-3 well pad
Well targets Permian sandstone reservoirs near Shell’s Dunk-1 site
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
EXR
OPEN ARTICLE