middle.news

Duketon Mining Confirms Robust Gold Mineralisation at Killarney Project

8:24am on Tuesday 25th of November, 2025 AEDT Mining
Read Story

Duketon Mining Confirms Robust Gold Mineralisation at Killarney Project

8:24am on Tuesday 25th of November, 2025 AEDT
Key Points
  • Second RC drill program confirms gold mineralisation continuity
  • Significant intercepts include up to 8m at 0.84g/t Au and 1m at 5.7g/t Au
  • Grade variability consistent with nuggety, structurally controlled system
  • PhotonAssay testing initiated to better assess gold distribution
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Duketon Mining (ASX:DKM)
OPEN ARTICLE