middle.news
How Fulcrum Lithium Achieved 91% Recovery at Alkali Flats – What’s Next?
9:40am on Tuesday 25th of November, 2025 AEDT
•
Mining
Read Story
How Fulcrum Lithium Achieved 91% Recovery at Alkali Flats – What’s Next?
9:40am on Tuesday 25th of November, 2025 AEDT
Key Points
Up to 91% lithium recovery after 4-hour sulfuric acid leach at 60°C
72% lithium recovery achieved at ambient temperature
Claystone mineralogy aligns with nearby advanced lithium projects
Phase 3 drilling planned to support detailed metallurgical studies
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Fulcrum Lithium (ASX:FUL)
OPEN ARTICLE