middle.news
Fulcrum Lithium Unveils High-Grade Nevada Claims Ahead of 2026 Drilling
10:42am on Wednesday 26th of November, 2025 AEDT
•
Mining
Read Story
Fulcrum Lithium Unveils High-Grade Nevada Claims Ahead of 2026 Drilling
10:42am on Wednesday 26th of November, 2025 AEDT
Key Points
201 unpatented lode claims staked covering 17 km² in Nevada
Surface samples show lithium grades up to 1,219 ppm
31 samples exceed 300 ppm lithium, 6 surpass 1,000 ppm
Project located in a geologically favorable closed basin with volcanic activity
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Fulcrum Lithium (ASX:FUL)
OPEN ARTICLE