middle.news

Fulcrum Lithium Unveils High-Grade Nevada Claims Ahead of 2026 Drilling

10:42am on Wednesday 26th of November, 2025 AEDT Mining
Read Story

Fulcrum Lithium Unveils High-Grade Nevada Claims Ahead of 2026 Drilling

10:42am on Wednesday 26th of November, 2025 AEDT
Key Points
  • 201 unpatented lode claims staked covering 17 km² in Nevada
  • Surface samples show lithium grades up to 1,219 ppm
  • 31 samples exceed 300 ppm lithium, 6 surpass 1,000 ppm
  • Project located in a geologically favorable closed basin with volcanic activity
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Fulcrum Lithium (ASX:FUL)
OPEN ARTICLE