middle.news
APA Group Joins Forces with CS Energy for 400MW Brigalow Peaking Plant
8:39am on Monday 1st of December, 2025 AEDT
•
Energy
Read Story
APA Group Joins Forces with CS Energy for 400MW Brigalow Peaking Plant
8:39am on Monday 1st of December, 2025 AEDT
Key Points
APA to acquire 80% ownership and lead construction management
400MW gas plant to complement renewable energy and meet peak demand
Project conditional on approvals and detailed engineering design
25-year hedge offtake agreement with inflation-linked returns
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
APA (ASX:APA)
OPEN ARTICLE