middle.news

APA Group Joins Forces with CS Energy for 400MW Brigalow Peaking Plant

8:39am on Monday 1st of December, 2025 AEDT Energy
Read Story

APA Group Joins Forces with CS Energy for 400MW Brigalow Peaking Plant

8:39am on Monday 1st of December, 2025 AEDT
Key Points
  • APA to acquire 80% ownership and lead construction management
  • 400MW gas plant to complement renewable energy and meet peak demand
  • Project conditional on approvals and detailed engineering design
  • 25-year hedge offtake agreement with inflation-linked returns
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about APA (ASX:APA)
OPEN ARTICLE