middle.news

Brazilian Critical Minerals Extends Premium REE Mineralisation at Ema Project

8:30am on Monday 1st of December, 2025 AEDT Mining
Read Story

Brazilian Critical Minerals Extends Premium REE Mineralisation at Ema Project

8:30am on Monday 1st of December, 2025 AEDT
Key Points
  • Infill drilling confirms premium-grade magnetic rare earth oxides regularly exceeding 200ppm
  • Significant intercepts averaging over 800ppm total rare earth oxides (TREO) across multiple holes
  • Extension of mineralisation by 4 kilometres beyond initial starter zone
  • Results validate and strengthen the in-situ recovery (ISR) geological model
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Brazilian Critical Minerals (ASX:BCM)
OPEN ARTICLE