middle.news
Brazilian Critical Minerals Extends Premium REE Mineralisation at Ema Project
8:30am on Monday 1st of December, 2025 AEDT
•
Mining
Read Story
Brazilian Critical Minerals Extends Premium REE Mineralisation at Ema Project
8:30am on Monday 1st of December, 2025 AEDT
Key Points
Infill drilling confirms premium-grade magnetic rare earth oxides regularly exceeding 200ppm
Significant intercepts averaging over 800ppm total rare earth oxides (TREO) across multiple holes
Extension of mineralisation by 4 kilometres beyond initial starter zone
Results validate and strengthen the in-situ recovery (ISR) geological model
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Brazilian Critical Minerals (ASX:BCM)
OPEN ARTICLE