middle.news

How Minerals 260 Doubled Bullabulling’s Gold Resource to 4.5Moz in 2025

3:52pm on Monday 1st of December, 2025 AEDT Mining
Read Story

How Minerals 260 Doubled Bullabulling’s Gold Resource to 4.5Moz in 2025

3:52pm on Monday 1st of December, 2025 AEDT
Key Points
  • Mineral Resource Estimate grows to 130Mt at 1.0g/t Au for 4.5Moz gold
  • 67% of resource classified as Indicated, up 1.6Moz from prior estimate
  • Maiden resource declared for Gibraltar deposit, 180koz gold
  • Updated economic assumptions include A$4,500/oz gold price and 92% metallurgical recovery
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about MINERALS 260 (ASX:MI6)
OPEN ARTICLE