middle.news
Zenith Minerals Validates Dulcie Gold Corridor with Promising Drilling Results
3:33pm on Monday 1st of December, 2025 AEDT
•
Mining
Read Story
Zenith Minerals Validates Dulcie Gold Corridor with Promising Drilling Results
3:33pm on Monday 1st of December, 2025 AEDT
Key Points
First eight drill holes at Dulcie North confirm broad, consistent gold mineralisation
Exploration Target of 0.3–0.8 million ounces supported by assay results
78-hole, 12,621-meter drilling program completed with assays pending for 70 holes
Strategic 3 km southern extension includes active heap-leach operations, reducing development risk
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
ZNC
OPEN ARTICLE