middle.news

How Ariana Resources Sparked Gold-Silver Production at Tavşan Mine

8:28am on Thursday 4th of December, 2025 AEDT Mining
Read Story

How Ariana Resources Sparked Gold-Silver Production at Tavşan Mine

8:28am on Thursday 4th of December, 2025 AEDT
Key Points
  • First doré pour of 13.4kg gold-silver completed at Tavşan Mine
  • Heap-leach pad loaded with ~30,000 tonnes; 800,000 tonnes stockpiled
  • 1.3 million tonnes mined with ongoing high-grade processing at Kiziltepe CIL plant
  • Production expected to reach steady-state by Q2 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Ariana Resources PLC (ASX:AA2)
OPEN ARTICLE