middle.news
How Ariana Resources Sparked Gold-Silver Production at Tavşan Mine
8:28am on Thursday 4th of December, 2025 AEDT
•
Mining
Read Story
How Ariana Resources Sparked Gold-Silver Production at Tavşan Mine
8:28am on Thursday 4th of December, 2025 AEDT
Key Points
First doré pour of 13.4kg gold-silver completed at Tavşan Mine
Heap-leach pad loaded with ~30,000 tonnes; 800,000 tonnes stockpiled
1.3 million tonnes mined with ongoing high-grade processing at Kiziltepe CIL plant
Production expected to reach steady-state by Q2 2026
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Ariana Resources PLC (ASX:AA2)
OPEN ARTICLE