middle.news

Marmota Accelerates Greenewood Drilling with Over 10,000m Completed in Stage 2

8:36am on Wednesday 17th of December, 2025 AEDT Mining
Read Story

Marmota Accelerates Greenewood Drilling with Over 10,000m Completed in Stage 2

8:36am on Wednesday 17th of December, 2025 AEDT
Key Points
  • Stage 2 drilling expanded to 129 holes and 10,117 metres
  • Total drilling at Greenewood now exceeds 25,000 metres in less than six months
  • High-grade gold intersections confirmed near surface
  • Assay results expected by end of January 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about MEU
OPEN ARTICLE