middle.news
Boss Energy Withdraws 2021 Feasibility Study, Eyes Cost Cuts with New Wellfield Design
9:49am on Thursday 18th of December, 2025 AEDT
•
Mining
Read Story
Boss Energy Withdraws 2021 Feasibility Study, Eyes Cost Cuts with New Wellfield Design
9:49am on Thursday 18th of December, 2025 AEDT
Key Points
Withdrawal of 2021 Enhanced Feasibility Study due to resource model deviations
Initiation of New Feasibility Study exploring wide-spaced wellfield design
Potential cost reductions and improved uranium recovery from lower-grade mineralisation
Integration plans for satellite deposits Gould’s Dam and Jason’s Deposit
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Boss Energy (ASX:BOE)
OPEN ARTICLE