middle.news

Falcon Metals Extends High-Grade Gold Zone 200m at Blue Moon Project

8:41am on Thursday 18th of December, 2025 AEDT Mining
Read Story

Falcon Metals Extends High-Grade Gold Zone 200m at Blue Moon Project

8:41am on Thursday 18th of December, 2025 AEDT
Key Points
  • 2.75m at 41.9g/t gold intersected 200m north along strike
  • Includes a high-grade 0.5m interval at 222g/t gold
  • Confirms continuity of Garden Gully reef into Falcon’s tenement
  • Ongoing drilling targeting further 200m step-outs and deeper zones
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Falcon Metals (ASX:FAL)
OPEN ARTICLE