middle.news
Boss Energy Revamps Honeymoon Strategy with New Wide-Spaced Wellfield Study
12:02pm on Thursday 18th of December, 2025 AEDT
•
Mining
Read Story
Boss Energy Revamps Honeymoon Strategy with New Wide-Spaced Wellfield Study
12:02pm on Thursday 18th of December, 2025 AEDT
Key Points
Withdrawal of 2021 Enhanced Feasibility Study due to resource deviations
Initiation of New Feasibility Study focused on wide-spaced wellfield design
FY26 production guidance of 1.6Mlbs U3O8 and cost targets reaffirmed
Potential inclusion of Gould’s Dam and Jason’s Deposit satellite projects
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Boss Energy (ASX:BOE)
OPEN ARTICLE