middle.news
How Savannah Goldfields Is Navigating Storms and Delays to Boost Georgetown Gold Output
4:26pm on Monday 26th of January, 2026 AEDT
•
Mining
Read Story
How Savannah Goldfields Is Navigating Storms and Delays to Boost Georgetown Gold Output
4:26pm on Monday 26th of January, 2026 AEDT
Key Points
23.088 kg of doré poured since December with partial refining results confirming 282 oz gold
Cumulative gold production of 434 oz and silver 327 oz since November 2025
Mining at Big Reef paused due to delayed drilling contractor arrival
Toll treatment material deliveries ongoing, with 2,600 tonnes planned for processing
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Savannah Goldfields (ASX:SVG)
OPEN ARTICLE