middle.news
Lunnon Metals Uncovers New Gold Structure at Paringa West with 8m @ 5.52 g/t
8:29am on Friday 9th of January, 2026 AEDT
•
Mining
Read Story
Lunnon Metals Uncovers New Gold Structure at Paringa West with 8m @ 5.52 g/t
8:29am on Friday 9th of January, 2026 AEDT
Key Points
8 metres at 5.52 g/t gold intersected at Paringa West
New northwest dipping mineralised structure confirmed
Results validate reinterpretation of 2024 drilling intercepts
Strategic proximity to Gold Fields’ processing infrastructure
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
LUNNON METALS (ASX:LM8)
OPEN ARTICLE