middle.news

Lunnon Metals Uncovers New Gold Structure at Paringa West with 8m @ 5.52 g/t

8:29am on Friday 9th of January, 2026 AEDT Mining
Read Story

Lunnon Metals Uncovers New Gold Structure at Paringa West with 8m @ 5.52 g/t

8:29am on Friday 9th of January, 2026 AEDT
Key Points
  • 8 metres at 5.52 g/t gold intersected at Paringa West
  • New northwest dipping mineralised structure confirmed
  • Results validate reinterpretation of 2024 drilling intercepts
  • Strategic proximity to Gold Fields’ processing infrastructure
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about LUNNON METALS (ASX:LM8)
OPEN ARTICLE