middle.news
Elixir Energy Mobilises Rig for High-Stakes Lorelle-3 Well in Taroom Trough
8:40am on Monday 12th of January, 2026 AEDT
•
Energy
Read Story
Elixir Energy Mobilises Rig for High-Stakes Lorelle-3 Well in Taroom Trough
8:40am on Monday 12th of January, 2026 AEDT
Key Points
Mobilisation of H&P FlexRig 3 underway for Lorelle-3 well
Two-phase drilling, vertical pilot hole and horizontal sidetrack
Targeting Dunk member of Tinowon Sands near Shell’s Dunk-1 well
Testing planned to demonstrate commercial gas and condensate flow
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Elixir Energy (ASX:EXR)
OPEN ARTICLE