middle.news

Wildcat Unveils Major Lithium Expansion at Bolt Cutter Central in Pilbara

8:30am on Tuesday 13th of January, 2026 AEDT Mining
Read Story

Wildcat Unveils Major Lithium Expansion at Bolt Cutter Central in Pilbara

8:30am on Tuesday 13th of January, 2026 AEDT
Key Points
  • Lithium mineralisation extended over 2km northwest and 800m northeast
  • Multiple stacked pegmatite dykes remain open in most directions
  • Diamond drilling to commence for depth expansion and metallurgical testing
  • RC drilling planned for resource modelling in early 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Wildcat Resources (ASX:WC8)
OPEN ARTICLE