middle.news
Viking Mines Unveils High-Grade Tungsten Assays Up to 1.3% WO3 at Linka Project
9:10am on Wednesday 14th of January, 2026 AEDT
•
Mining
Read Story
Viking Mines Unveils High-Grade Tungsten Assays Up to 1.3% WO3 at Linka Project
9:10am on Wednesday 14th of January, 2026 AEDT
Key Points
High-grade tungsten oxide assays up to 1.3% WO3 from Linka samples
Weighted average grade of 1.0% WO3 across four metallurgical samples
Linka is one of six US tungsten projects Viking is acquiring
Metallurgical testwork underway to develop scheelite concentrate processing
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Viking Mines (ASX:VKA)
OPEN ARTICLE