middle.news
Belararox Uncovers Extensive Sulphides in First Toro Central Drill Hole
8:32am on Wednesday 21st of January, 2026 AEDT
•
Mining
Read Story
Belararox Uncovers Extensive Sulphides in First Toro Central Drill Hole
8:32am on Wednesday 21st of January, 2026 AEDT
Key Points
First diamond drill hole completed to 705.6m at Toro Central
Visual sulphides intersected over 568.5m confirming chargeability anomaly
Second drill hole underway 400m north to test mineralisation continuity
MT/IP geophysical surveys resumed at Tambo South with 3D interpretation ongoing
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Belararox (ASX:BRX)
OPEN ARTICLE