middle.news

How Investigator Silver’s Paris DFS Optimisation Could Reshape Its Silver Future

9:11am on Thursday 22nd of January, 2026 AEDT Mining
Read Story

How Investigator Silver’s Paris DFS Optimisation Could Reshape Its Silver Future

9:11am on Thursday 22nd of January, 2026 AEDT
Key Points
  • DFS optimisation confirms 1.5 Mtpa plant throughput as optimal
  • Revised pit design reduces cut-off grade and improves strip ratio
  • Metallurgical testwork boosts silver recovery by ~6%
  • New high-priority targets Athena and Hestia identified in Paris Silver Corridor
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Investigator Silver (ASX:IVR)
OPEN ARTICLE