middle.news

How OzAurum Plans Low-Cost Gold Production at Mulgabbie North

9:46am on Thursday 22nd of January, 2026 AEDT Mining
Read Story

How OzAurum Plans Low-Cost Gold Production at Mulgabbie North

9:46am on Thursday 22nd of January, 2026 AEDT
Key Points
  • Stage 1 Mining Development & Closure Proposal lodged with WA regulators
  • Low-CAPEX heap leach design using 2 of 32 planned cells for early cash flow
  • Gold recoveries exceeding 80% in ongoing metallurgical testwork
  • Owner-operator mining model to maintain tight cost control
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Ozaurum Resources (ASX:OZM)
OPEN ARTICLE