middle.news
How Is Peninsula Energy Accelerating Uranium Production at Lance Project?
9:20am on Thursday 22nd of January, 2026 AEDT
•
Mining
Read Story
How Is Peninsula Energy Accelerating Uranium Production at Lance Project?
9:20am on Thursday 22nd of January, 2026 AEDT
Key Points
Acidification underway at Header House 16 in Mine Unit 4 (MU-4)
Flow rates at Header House 14 exceed reset plan targets, with pH reduction ahead of schedule
MU-4 expected to deliver 60% of 2026-27 uranium production
Central Processing Plant commissioning progressing with key upgrades
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Peninsula Energy (ASX:PEN)
OPEN ARTICLE