Blue Lagoon Yields 0.81% TREO; Dalaroo Plans Major 2026 Push

Dalaroo Metals is fast-tracking its 2026 exploration program at the Blue Lagoon project in Greenland following promising 2025 results that confirmed widespread rare earth and critical mineralisation. The company aims to define drill-ready targets and advance its position in the strategic critical minerals sector.

  • 2025 maiden campaign confirmed 2.7km strike of rare earth and critical minerals
  • Peak total rare earth oxides (TREO) assays reached 0.81%, with strong heavy rare earth enrichment
  • 2026 program to include geophysics, auger drilling, mineralogical and metallurgical sampling
  • Focus on de-risking project, demonstrating continuity at depth, and refining exploration models
  • Strategic engagement with Greenland authorities and local stakeholders planned
An image related to Dalaroo Metals Ltd
Image source middle. ©

Strong Start in Greenland

Dalaroo Metals Limited (ASX, DAL) is gearing up for an ambitious 2026 exploration campaign at its wholly owned Blue Lagoon Critical Minerals Project in southern Greenland. This follows a standout maiden field season in 2025 that rapidly elevated the project’s profile as a district-scale opportunity for rare earth elements (REE), zirconium, and niobium.

The 2025 program delivered encouraging early results, with all 113 samples returning anomalous values over a 2.7-kilometre strike length. Peak surface assays reached up to 0.81% total rare earth oxides (TREO), a grade that compares favourably with other globally recognised alkaline-hosted REE systems. Notably, the heavy rare earth oxides (HREO), including critical magnet metals dysprosium and terbium, showed strong lateral continuity, underpinning the project’s strategic potential.

Building on Momentum with a Systematic Approach

With this solid technical foundation, Dalaroo is fast-tracking its 2026 exploration program to move from surface sampling towards defining drill-ready targets. The upcoming work will integrate targeted geophysical surveys such as Ground Penetrating Radar (GPR) and lagoon depth scanning, systematic auger drilling, and detailed geochemical follow-up. These efforts aim to refine the geological model, assess mineralisation continuity at depth, and identify priority zones for accelerated advancement.

In addition to exploration, the company plans comprehensive mineralogical and metallurgical sampling to better understand ore characteristics and potential processing pathways. Early indications of natural upgrading in finer grain-size fractions suggest promising low-cost beneficiation options, a critical factor for future economic viability.

Strategic Positioning in a Growing Market

Blue Lagoon’s location within Greenland’s Paleoproterozoic rift province, known for its alkaline intrusive complexes, adds geological credibility to the project’s prospectivity. Greenland’s status as a conflict-free jurisdiction with increasing strategic interest in critical minerals supply chains further enhances the project’s appeal.

CEO John Morgan emphasised the company’s commitment to responsible exploration and stakeholder engagement, highlighting ongoing dialogue with Greenlandic authorities and local communities to ensure compliance and social licence. This approach aims to facilitate smooth operational progress and build long-term relationships in the region.

As global demand for secure, western-aligned sources of critical minerals intensifies; driven by electric vehicles, renewable energy technologies, and advanced electronics; Dalaroo’s Blue Lagoon project is well positioned to capture strategic value. The 2026 exploration season, expected to last around two weeks in the field, promises a steady flow of technical milestones that will be closely watched by investors and industry observers alike.

Bottom Line?

Dalaroo’s accelerated exploration at Blue Lagoon could soon transform early promise into a strategic critical minerals asset.

Questions in the middle?

  • Will 2026 drilling confirm mineralisation continuity at depth and support resource definition?
  • How will metallurgical test results influence potential processing strategies and project economics?
  • What timelines and milestones will Dalaroo set to advance Blue Lagoon towards development?