middle.news

Dateline Resources Uncovers Deep Sulphide Targets at Colosseum Gold-REE Project

8:44am on Tuesday 27th of January, 2026 AEDT Mining
Read Story

Dateline Resources Uncovers Deep Sulphide Targets at Colosseum Gold-REE Project

8:44am on Tuesday 27th of January, 2026 AEDT
Key Points
  • Completion of ground Induced Polarisation (IP) survey identifying elevated chargeability zones
  • Geophysical anomalies align with magneto-telluric and radiometric thorium data
  • Potential structurally controlled sulphide mineralisation at depth
  • 27.1Mt resource at 1.26g/t Au for 1.1Moz with over 67% Measured and Indicated
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about DTR
OPEN ARTICLE